A method for rapid evaluation while drilling for fractured reservoirs in buried hill:A case study of HZ 26-6 Structure,Pearl River Mouth Basin
XIONG Ting, DENG Zhuofeng, CAO Yingquan
Mud Logging Engineering . 2023, (1): 60 -67 .  DOI: 10.3969/j.issn.1672-9803.2023.01.010